Westfield: Work begins on $3.7M Columbia Greenway Rail Trail extension over Westfield River – MassLive.com


MassLive.com

Westfield: Work begins on $3.7M Columbia Greenway Rail Trail extension over Westfield River
MassLive.com
The railroad built the bridge in 1910 and raised it in 1919, according to the enthusiast website Bridgehunter.com. It was abandoned as a through-route in 1976 and was last used in the 1990s by the Pioneer Valley Railroad to service industry south of